AudlemOnline Logo Link

Canal Medical Bulletin

15th March 2021 @ 6:06am – by Dave Martin
Back home  /  News  /  Canal Medical Bulletin
canal repairscanal repairs

As AoL readers will be aware, the canal is somewhat indisposed at Bennett's Bridge.

This has been caused by a prolapse of a culvert under the canal. There was known to be a health problem with the culvert in Spring 2020, and indeed an inspection was made by the insertion of a camera, a procedure known as culvertoscopy.

Whilst the patient was clearly not in good health the problem was not deemed terminal, so a policy of active surveillance was instituted.

Indeed, the patient survived the busy boating season, but the winter rains in January caused a catastrophic injury and a prolapse occurred. Thanks to the care given by waterways healthcare staff, a disaster was avoided, but the patient was very sick.

Open canal bed surgery has ensued, with a culvert-ectomy. The patient then suffered piles beside the old raft launch site. This operation caused the bridge to have a nasty case of the tremors, from which it has recovered with no apparent damage. A complete culvert by-pass followed, using canal grade black plastic, as can be seen from the photograph.

All that's now needed is for the patient to be stitched up and the new waterworks tested for leakage.
Then Canal & River Trust consultants can sign-off the patient as fully recovered, hopefully in time for Easter.
Dave Martin

Get In Touch

AudlemOnline is powered by our active community.

Please send us your news and views using the button below:

Village Map

© 2005-2024 AudlemOnline
Visitors Today 28 / May 20,283