
ADCA Job Vacancy
Sat 19th Sep @ 6:10am

Best Local Cafe Finalist
Sat 19th Sep @ 6:07am

ADAPT Saturday Market
Sat 19th Sep @ 6:03am

We're Healthy!
Sat 19th Sep @ 6:01am

Tea in Hankelow
Fri 18th Sep @ 6:09am

Cricket Report
Fri 18th Sep @ 6:07am

Greek Evening 26th September
Fri 18th Sep @ 6:05am

St James – Open Days & Pizzas – TODAY!
Thu 17th Sep @ 6:10am
There are some roadworks starting soon in Audlem, as detailed below. All involve the use of traffic control systems and thankfully none entail road closures or diversions, so access in and out of the village shouild hopefully only be slightly disrupted.
23/10/2017 to 28/10/2017
- Audlem Road – Hankelow
- Traffic control (Multi-Way Signal)
- This is to give BT safe access to the underground network for cabling works.
24/10/2017 to 26/10/2017
- Cheshire Street, outside the Public Hall
- Traffic control (Two-Way Signals)
- This is to allow United Utilities to Install a new 32mm water connection.
24/10/2017 to 25/10/2017
- Green , near the junction with the A525
- Traffic control (Two-Way Signals)
- This is to allow BT to maintain/renew a facility of the foot path.
This article is from our news archive. As a result pictures or videos originally associated with it may have been removed and some of the content may no longer be accurate or relevant.
Get In Touch
AudlemOnline is powered by our active community.
Please send us your news and views using the button below:
Email: editor@audlem.org





