ADAPT November recipe

Home » Latest News » ADAPT November recipe
Lentil and Apple Pate

ADAPT Recipe of the Month

Lentil and Apple Pate
by Maggie Chatfield

Ingredients:
4oz brown Chinese lentils
1/2 pint water
1bay leaf
2 small (or 1 really large) Bramley apples (I use whatever apples I have)
4 tablespoons olive oil
1medium onion finely chapped
2 tablespoons tahini
Salt and pepper to taste

Method:
Put the lentils into a saucepan with water and bayleaf, seasoning well. Cover and set on a low heat. Bring to the boil and simmer gently for 1 horr, by which time all the water should be absorbed and the lentils tender.

Removethe bayleaf and mash the lentils well.

Peel, core and finely chop the apples. Heat the oil in a saucepan on a low heat and mix in the onions and apples. Coverand cook them gently for 10 minutes or until the apples can be beaten to a pulp.

Thoroughly mix in the lentils. Takethe pan from the heat and mix in the tahini. Press the mixture into an earthenware bowl or four ramekins and chill until firm.

popular recent storiesAlso in the news

Billy Gibbons
Sat 16 Nov 6:07am  |  hits: 914

Hello. Audlem is yet again featured on national TV!Tuesday 19th November at 3.00pmChannel 4 HD (and probably at 4pm on Channel 4+1)Season 4, Episode 2 of Find It Fix It Flog ItSimon O'Brien and Max McMurdo head for Crewe to meet rock and roller Billy, who lives in a house that is frozen in time in the...

fireworks
Sat 16 Nov 6:08am  |  hits: 685

The New Years Eve event We aim to mark the passing of the year 2019 in traditional manner as we have so done since we welcomed in the new millennium in 2000. Apart for the one year when it did not happen!.This year we are again well on track to enjoy the camaraderie of being in the Square at Midnight on the 31st .I am close to receiving the needed funds and I urge all who wish to give their...

greys bridge
Sun 17 Nov 6:08am  |  hits: 652

The bridge from Green Lane into Turnpike Field, known as Grey's Bridge has been reinstated after being swept away by the recent floods.The 'Footpath Closed' sign has been removed but that on the canal end of the footpath remains.Unsurprisingly the lower part of the field remains very slippery and muddy, negotiable only with care.For previous report on AudlemOnline click...